Project Name : Construction of New Vehicular Under pass (VUP) at km – 69+900 on NH-162 (old NH-14) for Sojat town near Ganga petrol pump.
- Casting of RE Wall blocks , corner blocks (if required) including all required block casting machine , block moulds , accessories, equipment, materials and labours for carriage. Laying and vibrating of concrete but excluding the cost of Raw material for concrete .(Quantity – 5400 sqm. Approx .Qty).
- Demoulding and stacking of RE Wall blocks with all the Labour , Machines and other equipment at casting yard.
- Curing or RE Wall blocks with required labour , machine and equipment for 28 days as per MORTH standards and specifications.
- Transportation and unloading of RE Wall blocks from casting yard to project site with required labour tractor will be in scope of P/C only.
- Erection of RE Wall blocks along with fixing of geo grids & Geo textile with all required labour , accessories , machines and materials. It also includes concrete laying at leveling pad , coping of RE Wall & corner casting (if required.).
- Filter media placing and filling the hollow block portion.
- Fixing drainage pipe in RE Wall with Geo textiles.